Products

Furnaces for alloying Zinc with Aluminium or zinc with aluminium/copper
Home > Product > Induction Furnaces > Furnaces for melting Zinc and it's alloys > Furnaces for alloying Zinc with Aluminium or zinc with aluminium/copper
Continuous metal output through pump : (twin furnace concept)

  • Coreless Alloying furnace with high stirring for alloying molten zinc with Aluminium or aluminium and copper.
  • Twin chamber channel furnace with casting chamber (housing metal pump) for holding and dispensing alloyed metal for continuous metal output.

 


Batch output through hydraulic tilting: (single furnace concept)


Optimum bath movement of coreless furnace ensures

  • Ease in alloying of molten zinc with aluminium or copper and aluminium.
  • Homogeneity of melt. No need for external stirrer.
* Send your Enquiry and we will be in touch with you

Some Of Our Esteemed Clients
For the Post of : Marketing Engineer
18-05-2012
Department : Marketing Qualification : B.E. / M.E.
Specialization : Civil Experience : 2 to 7 years
Location : Vadodara  
Profile :
Candidates should have a BE/ME degree in Marketing with 2-7 years of experience in engineering designs, layout in real estate organization. Should possess thorough knowledge of technicalities of high rise. Responsibilities include co-ordinating with consultants, verification and providing alternatives of conceptual to working drawings and release of drawing to sites.